HISTORY
The plant of Nexans Kabelmetal (Ghana) Ltd. was opened on 31st July 1970, after feasibility study conducted by a German company, Planungsgruppe Juergen Richter, with the backing of the National Investment Bank (NIB) of Ghana.
After the study that also involved Kabel und Metalwerke (Kabelmetal) of Hanover, Germany, the group recommended that wire drawing and cable manufacture would be a viable enterprise in Ghana. Hence the establishment of Nexans Kabelmetal (Ghana) Limited.
To the top
|